Projects Include:

  • Allied Waste Solid Waste Collection and Recycling Center, Fort Mill, SC.  Performed structural design of an 11,000 square waste recycling center in Fort Mill, S.C.  Project requirements included a steel-reinforced concrete foundation, slab and retaining wall structure, 4 delivery bays and support of prefabricated metal shell building.
  • Interpath Communications, Research Triangle Park, NC.  Investigated the failure of a computer access floor system which had halted construction of a 70,000 sf Internet and telecommunication hub facility.  Provided a fast-track investigation, identified key construction system conflicts, developed and inspected cost-effective solutions permitting the project to proceed.
  • Glenwood Plaza Building, Raleigh, NC.  Identified problems, designed repairs and assisted owners in evaluating alternative solutions for chronic water intrusion through brick veneer at 5 story, 130,000 sf office building.
  • Raleigh City Market, Raleigh, NC.  Designed structural modifications for historic brick and steel truss retail building in downtown district.

Commercial services include Property Condition Assessments, performance evaluations of all types of general construction including structural systems, exterior claddings and fenestration, roofing, pavements, drainage, and structural design of new construction and repairs and renovations, damage and failure investigations including design emergency shoring.